NoMad LA Hotel

NoMad LA Hotel

" The truth is, Mitsubishi Electric is a far superior product than its industry competitors. And to that point, we have not heard one single complaint from engineering or hotel management about the system."

Situated in the heart of downtown, NoMad Los Angeles, is the newest luxury hotel from Sydell Group, known for their high-end, cuisine-focused hospitality venues. After buying the historic Bank of Italy building originally built in the 1920s, Sydell Group set out to refurbish the hotel, marrying together the original design with modern elements, all while being careful not to modify the building too much. For NoMad LA, top-of-the-line mechanical systems were a must. After consulting with their general contractor and mechanical contractor, the choice was clear: Mitsubishi Electric Cooling & Heating CITY MULTI® Variable Refrigerant Flow systems. Download the PDF below to read more.


NoMad Hotel

Project Location: Los Angeles, California
Completion Date: January 2018

Project Team

  • Management Company: Sydell Group, Los Angeles, California
  • General Contractor: R.D. Olson Construction, Inc., Irvine, California
  • Mechanical Contractor: Talent Air, Cypress, California
  • Mechanical Engineer: Creative Engineering Group, Canoga Park, California

Mitsubishi Electric Equipment Installed

  • (21) PURY-P168YLMU-A R2-Series Outdoor Units
  • (2) PUHY-P168YLMU-A Y-Series Outdoor Units
  • (1) PUMY-P48NHMUR4 S-Series Outdoor Unit
  • (3) PUMY-P60NKMU S-Series Outdoor Units
  • (6) PKFY-P18NHMU-E2 Wall-Mounted Indoor Units
  • (269) PEFY-PNMSU-E Ceiling-Concealed Ducted Indoor Units
  • (20) PVFY-P12NAMU-E Multi-Position Air Handlers
  • (305) PAC-YT53CRAU-J Simple MA Remote Controllers
  • (3) AE-200A Centralized Controllers
  • (4) AE-50A Expansion Controllers